If you can’t find it, we’ll make it for you!

FREE Shipping On All Orders Over £100. Excludes Conveyor Systems

  • Free Delivery On Orders Over £100

  • Best Price Guaranteed

  • Can't Find It, We'll Make It For You

  • Over 40 Years of Expertise

Custom Projects

INDUSTRIAL STORAGE TENTS

These structures are one of the miracles of modern engineering. They apply next to no ground loadings and require minimal civil engineering.  They also provide instant undercover space, especially in yard areas which would otherwise be impractical to develop, for example, quarry locations and gravel pits. Their ability to retract releases production space, vehicular loading areas and undercover preparation areas for a fraction of the cost of traditional steel-framed building prices

  • Here are some applications to inspire you:-

    • Outdoor welding bays
    • Plant and machinery covers for pumping stations
    • Home delivery marshalling areas for click and collect
    • Home delivery marshalling stations for deliveries direct from the supermarket
    • External warehousing
    • External manufacturing facilities
    • Van loading operations
    • Market gardens and DIY garden centres to enable year-round shopping
    • Temporary manufacturing and storage facilities
    • Military applications
    • Aircraft hangars
    • Tank covers for processing operations
    • Medical field applications
    • Low-level nuclear waste processing plants
    • Dock tunnels and vehicle loading systems
    • Portside warehousing

    It is limited only by your own imagination. These industrial storage tents together with loading bay structures are manufactured by our Italian factory, Kopron SpA, with whom we have a longstanding relationship and for whom we are the U.K. engineers, handling everything from concept to completion on site.

    We are an integral part of a £20 billion manufacturing network, delivering engineered solutions that prioritise creation and innovation rather than simple procurement. Unlike sourcers and resellers, our focus is on commissioning and producing high-quality, bespoke products to meet specific needs. This distinction underscores our commitment to hands-on manufacturing and the value we bring to the process, emphasising the importance of making things rather than merely sourcing them.

    We also do portal frame steel buildings and temporary buildings for long term use.

  • GENERAL PROJECT TIMESCALES

    • Manufacturing Time & Pre-Planning 6 weeks
    • Design Time 2 - 3 Weeks
    • Planning Applications Up To 8 Weeks
    • Time on Site to Erect 7 - 10 Days
    • Groundwork Only where no concrete apron exists
    • Fast Track Options Possible
    • Project Management Options Yes
    • Manufacturers Yes
    • Pre-Project Schematics Yes
    • Trades and Fit Out Options Yes

    8 things we will do for you:-

    • Free advice on planning and construction
    • Preliminary drawings for sizing and suitability
    • Site survey to discuss possibilities
    • Internal layouts and equipment positioning
    • Pricing for feasibility
    • Design drawings and initial surveys
    • Pre-planning surveys
    • A full range of accessories to tackle most environment applications

Need a Quote?

Get in-touch with your exact requirements